Flare gas recovery at an export terminal

Recovery of continuous flaring into the fuel gas system with a packaged compression skid.

-81%

Flaring

146 kt/yr

CO₂e avoided

$6.3M/yr

Fuel savings

Challenge

The problem on site

The terminal flared 9 MMscfd continuously, a regulatory and reputational issue for the joint venture.

Solution

What Halvard delivered

We installed a liquid-ring compressor skid and FG-90 low-smoke tips, routing recovered gas to power generation.

Location

Bonny Island, Nigeria