Risk-based inspection programme on a deepwater FPSO
RBI methodology rolled out on 2,300 topsides items, with rope-access NDT teams on board.
-37%
Inspection hours
2,300
Items assessed
3,900
Bed nights saved
Challenge
The problem on site
Time-based inspection consumed 40 % of POB capacity and still missed degradation hot spots.
Solution
What Halvard delivered
We built the RBI model, re-prioritised inspection plans and deployed multi-skilled rope access crews.
Location
Block 17, Angola