Process Equipment
Boil-off gas compression for an LNG terminal
Supply and installation of two boil-off gas compressors to stop venting during ship loading.
-96%
Flaring events
38 t/day
Gas recovered
2 weeks early
Delivery
Challenge
The problem on site
Boil-off gas exceeded recondenser capacity during peak loading, forcing intermittent flaring.
Solution
What Halvard delivered
Two RC-4 packages with low-temperature materials route boil-off gas back into the send-out header.
Location
Bintulu, Malaysia