HALVARDENERGY SERVICES

Process Equipment

Boil-off gas compression for an LNG terminal

Supply and installation of two boil-off gas compressors to stop venting during ship loading.

-96%

Flaring events

38 t/day

Gas recovered

2 weeks early

Delivery

Challenge

The problem on site

Boil-off gas exceeded recondenser capacity during peak loading, forcing intermittent flaring.

Solution

What Halvard delivered

Two RC-4 packages with low-temperature materials route boil-off gas back into the send-out header.

Location

Bintulu, Malaysia

Related equipment & services

Process Equipment Supply

Pumps, compressors, separators and valves, engineered and certified.

View service
Turnaround execution at a coastal refinery

Next project

Turnaround execution at a coastal refinery

Have a similar project in mind?

Tell us the scope, the standards and the timeline. We'll come back with a plan.