Pipeline
Intelligent pigging of 240 km subsea export line
Ultrasonic inline inspection and fitness-for-service study of a 30" gas export pipeline.
240 km
Pipeline
+15 yrs
Life extension
€4.1M
Repairs avoided
Challenge
The problem on site
The line had never been inspected end to end and the operator needed a life extension case within 6 months.
Solution
What Halvard delivered
A dual-diameter UT tool run, combined with corrosion growth modelling, produced a 15-year integrity plan.
Location
Norwegian Sea
Related equipment & services
Pipeline Engineering & Integrity
Design, construction support, pigging and integrity management.